POWER II
Sector: Power Generation (CCGT) • Location: Malaysia
Source: World Bank Group
The Central Electricity Board Project consists of the second stage of the Cameron Highlands hydroelectric scheme (known as the Batang Padang Scheme), the first stage of the Prai Thermal Power Station, and the expansion of transmission facilities. The Batang Padang Scheme will have an initial installed capacity of 102.8 MW, and an ultimate installed capacity of 154.2 MW. The Prai Thermal Power Stat
- Status
- Closed
- Sector
- Power Generation (CCGT), Geothermal, Government, Hydro
- Location
- Malaysia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Central Electricity Board Project consists of the second stage of the Cameron Highlands hydroelectric scheme (known as the Batang Padang Scheme), the first stage of the Prai Thermal Power Station, and the expansion of transmission facilities. The Batang Padang Scheme will have an initial installed capacity of 102.8 MW, and an ultimate installed capacity of 154.2 MW. The Prai Thermal Power Station will have an initial installed capacity of 60 MW, but it will be designed for an ultimate installed capacity of 270 MW. The expansion of transmission facilities will provide for the interconnection of all major generating stations on the western side of Malaya and for the expansion of transmission systems in northwestern and southwestern areas. The project is technically sound, the estimated cost is reasonable, construction schedules are realistic, and arrangements for construction are satisfactory. The generating capacity provided by the project is necessary to meet the expected demand for power in the interconnected service area. The installations will be the most economical means of meeting this demand. The interconnection will result in the more efficient utilization of the area's generating facilities. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Malaysia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Geothermal, Government, Hydro |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
