logo
ProjectClosed

POWER II

Closed · Congo, Democratic Republic of

Source: World Bank Group

Through this Second Power Project, Zaire hopes to (a) ensure a reliable supply of electrical energy to the main interconnected networks of Bukavu, Goma, Uvira and Kiliba; (b) make use of the electric energy within the Zaire (Kivu) - Rwanda - Burundi interconnected system; and (c) strengthen Societe Nationale d'Electricite (SNEL) as an institution. These objectives will be achieved through several

Status
Closed
Sector
Power Generation (CCGT), Hydro, Government
Location
Democratic Republic of the Congo
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about POWER II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “POWER II” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Congo, Democratic Republic of. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Through this Second Power Project, Zaire hopes to (a) ensure a reliable supply of electrical energy to the main interconnected networks of Bukavu, Goma, Uvira and Kiliba; (b) make use of the electric energy within the Zaire (Kivu) - Rwanda - Burundi interconnected system; and (c) strengthen Societe Nationale d'Electricite (SNEL) as an institution. These objectives will be achieved through several methods. The first will be accomplished by (i) rehabilitating the existing Ruzizi I plant and the distribution networks of (a); (ii) completing the rehabilitation of the generation stations and transmission and distribution system in the Shaba Region; and (iii) carrying out urgent maintenance works and improving operation of the Inga hydropower complex. Secondly, optimal use of electric energy will be achieved through increasing the transmission and distribution capacity of the electricity network in that portion of the Kivu region where there is considerable suppressed demand. Finally, SNEL will be strengthened through better planning, rational pricing, improved financial policies and training of its staff.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Democratic Republic of the Congo (DRC)

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydro, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project