POWER II
Sector: Power Generation (CCGT) • Location: Congo, Democratic Republic of
Source: World Bank Group
Through this Second Power Project, Zaire hopes to (a) ensure a reliable supply of electrical energy to the main interconnected networks of Bukavu, Goma, Uvira and Kiliba; (b) make use of the electric energy within the Zaire (Kivu) - Rwanda - Burundi interconnected system; and (c) strengthen Societe Nationale d'Electricite (SNEL) as an institution. These objectives will be achieved through several
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Through this Second Power Project, Zaire hopes to (a) ensure a reliable supply of electrical energy to the main interconnected networks of Bukavu, Goma, Uvira and Kiliba; (b) make use of the electric energy within the Zaire (Kivu) - Rwanda - Burundi interconnected system; and (c) strengthen Societe Nationale d'Electricite (SNEL) as an institution. These objectives will be achieved through several methods. The first will be accomplished by (i) rehabilitating the existing Ruzizi I plant and the distribution networks of (a); (ii) completing the rehabilitation of the generation stations and transmission and distribution system in the Shaba Region; and (iii) carrying out urgent maintenance works and improving operation of the Inga hydropower complex. Secondly, optimal use of electric energy will be achieved through increasing the transmission and distribution capacity of the electricity network in that portion of the Kivu region where there is considerable suppressed demand. Finally, SNEL will be strengthened through better planning, rational pricing, improved financial policies and training of its staff. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
