POWER II
Closed · Congo, Democratic Republic of
Source: World Bank Group
Through this Second Power Project, Zaire hopes to (a) ensure a reliable supply of electrical energy to the main interconnected networks of Bukavu, Goma, Uvira and Kiliba; (b) make use of the electric energy within the Zaire (Kivu) - Rwanda - Burundi interconnected system; and (c) strengthen Societe Nationale d'Electricite (SNEL) as an institution. These objectives will be achieved through several
- Status
- Closed
- Sector
- Power Generation (CCGT), Hydro, Government
- Location
- Democratic Republic of the Congo
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Through this Second Power Project, Zaire hopes to (a) ensure a reliable supply of electrical energy to the main interconnected networks of Bukavu, Goma, Uvira and Kiliba; (b) make use of the electric energy within the Zaire (Kivu) - Rwanda - Burundi interconnected system; and (c) strengthen Societe Nationale d'Electricite (SNEL) as an institution. These objectives will be achieved through several methods. The first will be accomplished by (i) rehabilitating the existing Ruzizi I plant and the distribution networks of (a); (ii) completing the rehabilitation of the generation stations and transmission and distribution system in the Shaba Region; and (iii) carrying out urgent maintenance works and improving operation of the Inga hydropower complex. Secondly, optimal use of electric energy will be achieved through increasing the transmission and distribution capacity of the electricity network in that portion of the Kivu region where there is considerable suppressed demand. Finally, SNEL will be strengthened through better planning, rational pricing, improved financial policies and training of its staff. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Democratic Republic of the Congo (DRC) |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
