logo

POWER II

Sector: Power Generation (CCGT) • Location: Mauritius

Source: World Bank Group

Project
Closed

The project aims to assist CEB in carrying out its development plan for the period 1977-1982 by providing additional power transmission and distribution capacity to supply points; increasing reliability for the system operations, and strengthening CEB's organization and operations. Its major components include: (i) construction of 66-kV and 22-kV transmission extensions (consisting of about 75 km

Status
Closed
Sector
Power Generation (CCGT), Seaport, Government
Location
Mauritius
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about POWER II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “POWER II” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Mauritius. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project aims to assist CEB in carrying out its development plan for the period 1977-1982 by providing additional power transmission and distribution capacity to supply points; increasing reliability for the system operations, and strengthening CEB's organization and operations. Its major components include: (i) construction of 66-kV and 22-kV transmission extensions (consisting of about 75 km of power transmission lines, about 8 km of underground cables and 275 MVA of transformer capacity); (ii) extensions to the distribution system; (iii) construction of a system control center; (iv) consulting services to carry out various studies; and (v) training. The project is the least-cost solution for the transmission and distribution of electricity for meeting forecast demand; improvement in the reliability of electricity supply and reduction in system losses as well as increased efficiency in the operation of CEB.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Mauritius

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Seaport, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project