POWER II
Sector: Power Generation (CCGT) • Location: Iran, Islamic Republic of
Source: World Bank Group
The project comprises: (i) single circuit 400 kV transmission (totalling 845 km) from the Karun hydroelectric plant to the major load centers of Arak, Esfahan, Omidieh and Ahwaz; all these, except Esfahan, are already on the interconnected system. Power supply to the system will thereby be increased by 500 MW in 1974 and by a further 250 MW in each of the years 1975 and 1976. (ii) Double circuit (
- Status
- Closed
- Sector
- Power Generation (CCGT), Government
- Location
- Iran
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project comprises: (i) single circuit 400 kV transmission (totalling 845 km) from the Karun hydroelectric plant to the major load centers of Arak, Esfahan, Omidieh and Ahwaz; all these, except Esfahan, are already on the interconnected system. Power supply to the system will thereby be increased by 500 MW in 1974 and by a further 250 MW in each of the years 1975 and 1976. (ii) Double circuit (206 km) and single circuit (77 km) 230 kV transmission lines to extend the existing interconnected transmission system in Southern Iran to Shiraz and Borazjan, which are now supplied soley by diesel units and gas turbines. (iii) A three-year comprehensive training program to be organized and implemented by consultants for TAVANIR's staff. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Iran |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
