POWER II
Sector: Power Transmission • Location: Jordan
Source: World Bank Group
The Second Hussein Thermal Power Project will, as its main objective, seek to prepare JEA to be an efficient public bulk supply utility, providing economic and reliable service, and removing capacity shortages. It includes: (a) a third 33-MW steam-electric unit to be installed at the Hussein Power Station at Zarqa; (b) reconditioning of the diesel-electric power station at Marqa, presently owned b
- Status
- Closed
- Sector
- Power Transmission, Geothermal, Power Generation (CCGT), Government
- Location
- Jordan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Second Hussein Thermal Power Project will, as its main objective, seek to prepare JEA to be an efficient public bulk supply utility, providing economic and reliable service, and removing capacity shortages. It includes: (a) a third 33-MW steam-electric unit to be installed at the Hussein Power Station at Zarqa; (b) reconditioning of the diesel-electric power station at Marqa, presently owned by JEPCO; and (c) a power development study for southern Jordan. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Jordan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Geothermal, Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
