logo
ProjectClosed

POWER III (AGUACAPA)

One of 2,534 projects Taiyo tracks in Guatemala.

Source: World Bank Group

The Aguacapa Power Project consists of: (A) Generation: (1) construction of a concrete gravity diversion dam in the Aguacapa River (90,000 cubic meters) and a reservoir of 300,000 cubic meters for daily regulation; (2) construction of a concrete lined power tunnel; (3) construction of a steel penstock; and (4) Construction of a power station with three 30 MW generating units. (B) Transmission: (1)

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Hydro, Tunnel, Metal, Steel, Cement, Government
Location
Guatemala
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about POWER III (AGUACAPA)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “POWER III (AGUACAPA)” is an infrastructure initiative in the Water Supply and Storage sector, located in Guatemala. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Aguacapa Power Project consists of: (A) Generation: (1) construction of a concrete gravity diversion dam in the Aguacapa River (90,000 cubic meters) and a reservoir of 300,000 cubic meters for daily regulation; (2) construction of a concrete lined power tunnel; (3) construction of a steel penstock; and (4) Construction of a power station with three 30 MW generating units. (B) Transmission: (1) construction of step-up transformation facilities at the power plant; (2) construction of a switching station (230 kV) at about 500 m downstream from the power plant; and (3) construction of a single-circuit transmission line at 230 kV to the existing Escuintla substation (23 km). (C) Consultant's Services: (1) 40 man-months for personnel administration and financial management.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Guatemala

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Hydro, Tunnel, Metal, Steel, Cement, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project