POWER III
Sector: Power Generation (CCGT) • Location: Iran, Islamic Republic of
Source: World Bank Group
The project would provide construction of approximately 250 km of 400-kV transmission lines between Arak and Tehran including the associated Arak and Firuz Bahram substations to strengthen the interconnection between the north and south systems; and the purchase and installation of about 400 MW of gas turbine capacity at Bandar Abbas, Sar Chesmeh and Ahwaz to supply rapidly growing loads on the so
- Status
- Closed
- Sector
- Power Generation (CCGT), Wind, Government
- Location
- Iran
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER III
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project would provide construction of approximately 250 km of 400-kV transmission lines between Arak and Tehran including the associated Arak and Firuz Bahram substations to strengthen the interconnection between the north and south systems; and the purchase and installation of about 400 MW of gas turbine capacity at Bandar Abbas, Sar Chesmeh and Ahwaz to supply rapidly growing loads on the southeast and main systems. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Iran |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Wind, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
