logo

POWER III

Sector: Power Generation (CCGT) • Location: Yemen, Republic of

Source: World Bank Group

Project
Closed

The YGEC hopes to extend its service, at minimal cost, to facilitate better utilization of its generation and transmission facilities and to strengthen its staffing, management, planning and finances. This project proposes to assist the borrower in accomplishing these goals as well as formulating technical standards for private installations. Elements of the project include: (a) installation of di

Project Information FAQ

Project Information

5 Q
The project “POWER III” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Yemen, Republic of. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The YGEC hopes to extend its service, at minimal cost, to facilitate better utilization of its generation and transmission facilities and to strengthen its staffing, management, planning and finances. This project proposes to assist the borrower in accomplishing these goals as well as formulating technical standards for private installations. Elements of the project include: (a) installation of distribution networks in the rural areas of Ba'dan, Al Misrakh, Marawiah, and expansion of the distribution networks in Bani Hushaysh; (b) upgrading and expansion of the distribution networks in the cities of Sanaa, Taiz, and Hodeida; (c) construction of subtransmission lines to connect industrial consumers and auto-producers within and in the vicinities of the cities of Sanaa, Taiz and Hodeida; (d) improvement of YGEC's organizational structure, management, staffing and financial operations, including computerization of its billing and accounting system; (e) technical assistance in project preparation and construction supervision; and (f) training. It also includes the installation of about 930 km of medium and low voltage lines, 33 distribution substations at a capacity of 90 MVA, 300 distribution transformers at 14 MVA, 15,500 meters and boards, and 1300 streetlights.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data