POWER III
Sector: Water Supply and Storage • Location: Sudan
Source: World Bank Group
The proposed project is designed to help meet Sudan's power requirements up to the end of 1986. The project would include the following elements: (a) addition of the fifth and sixth hydro-units (80 MW) at the existing Roseires hydroelectric facility plus embedded parts of unit seven; (b) reinforcement of the 33 kV transmission circuits between Burri and Khartoum North substations; (c) extention to
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed project is designed to help meet Sudan's power requirements up to the end of 1986. The project would include the following elements: (a) addition of the fifth and sixth hydro-units (80 MW) at the existing Roseires hydroelectric facility plus embedded parts of unit seven; (b) reinforcement of the 33 kV transmission circuits between Burri and Khartoum North substations; (c) extention to Kartoum North substation; (d) engineering and site supervision; (e) management and staff training, (f) stringing of the second 220-kV transmission circuit between Sennar junction and the Kilo X substation in Khartoum; (g) installation of about 40 MW diesel generating capacity of Burri power station; (h) installation of the first and second units (2 x 30 MW) at the Khartoum North steam power plant. The physical risks of the project are negligible. Other risks associated with managerial/administrative capacity would be mitigated by the project. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in Sudan
- White Nile Sugar Factory
- Omdurman Water Treatment Plant
- Juba port concession
- South Port Container Terminal at Port Sudan Concession
- food security
- Cross-border collaboration Western Ethiopia - East Sudan
- Promotion of the civil society in Sudan
- Sudan - Institutional Capacity Building for Improved Access to Water and Sanitation in Port Sudan
