logo
ProjectClosed

POWER III

Sector: Water Supply and Storage • Location: Sudan

Source: World Bank Group

The proposed project is designed to help meet Sudan's power requirements up to the end of 1986. The project would include the following elements: (a) addition of the fifth and sixth hydro-units (80 MW) at the existing Roseires hydroelectric facility plus embedded parts of unit seven; (b) reinforcement of the 33 kV transmission circuits between Burri and Khartoum North substations; (c) extention to

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Geothermal, Government, Hydro
Location
Sudan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about POWER III

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “POWER III” is an infrastructure initiative in the Water Supply and Storage sector, located in Sudan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project is designed to help meet Sudan's power requirements up to the end of 1986. The project would include the following elements: (a) addition of the fifth and sixth hydro-units (80 MW) at the existing Roseires hydroelectric facility plus embedded parts of unit seven; (b) reinforcement of the 33 kV transmission circuits between Burri and Khartoum North substations; (c) extention to Kartoum North substation; (d) engineering and site supervision; (e) management and staff training, (f) stringing of the second 220-kV transmission circuit between Sennar junction and the Kilo X substation in Khartoum; (g) installation of about 40 MW diesel generating capacity of Burri power station; (h) installation of the first and second units (2 x 30 MW) at the Khartoum North steam power plant. The physical risks of the project are negligible. Other risks associated with managerial/administrative capacity would be mitigated by the project.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Sudan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Geothermal, Government, Hydro

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project