POWER III
Closed · Eswatini
Source: World Bank Group
The Project would provide a 20 MW hydroelectric generating facility on the Little Usutu River to help Swaziland meet a growing demand for power and reduce dependence on electricity imports from the Republic of South Africa. It would consist of a 40-meter high rockfill dam and a hydraulic system leading to a powerhouse with two 10 MW turbine generators. Consulting services for studies of the utilit
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Wind, Government, Hydro
- Location
- Eswatini
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER III
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project would provide a 20 MW hydroelectric generating facility on the Little Usutu River to help Swaziland meet a growing demand for power and reduce dependence on electricity imports from the Republic of South Africa. It would consist of a 40-meter high rockfill dam and a hydraulic system leading to a powerhouse with two 10 MW turbine generators. Consulting services for studies of the utility's tariff structure, resettlement of some 300 people in the reservoir area, bid evaluation and construction supervision, and its implications for human health and fish resources would be included in the Project. The Project would have no special technical or economic risks. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Eswatini |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Wind, Government, Hydro |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Eswatini
- Swaziland- Mbabane Manzini corridor (Nondvo) multipurpose dam study
- FirstRand Rest of Africa Central Bank Mandatory Reserves Coverage
- Eswatini - Mkhondvo-Ngwavuma Water Augmentation Program Phase IA (MNWAP-1A)
- Eswatini - Komati Downstream Development Project (KDDP)
- Eswatini - Lower Usuthu Smallholder Irrigation Project Preliminary Studies Phase II
- Eswatini - Manzini Region Water Supply and Sanitation Project
- Lupohlo-Ezulwini Hydro Power
- Eswatini - Mkondvo-Ngwavuma Water Augmentation Program (MNWAP) Study
