POWER III
Sector: Nuclear • Location: Taiwan, China
Source: World Bank Group
The proposed project represents about 7 percent of Taipower's 1971-76 expansion program. The project will consist of: (i) the construction of the Talin No. 5 thermal generation unit with a capacity of 500 MW, the major item of the project; (ii) the provision of sub-station facilities to transmit the power generated by the Chinsan No. 1 nuclear generating unit; and (iii) the provision of equipment
- Status
- Closed
- Sector
- Nuclear, Power Generation (CCGT), Geothermal, Government
- Location
- Taiwan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER III
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project represents about 7 percent of Taipower's 1971-76 expansion program. The project will consist of: (i) the construction of the Talin No. 5 thermal generation unit with a capacity of 500 MW, the major item of the project; (ii) the provision of sub-station facilities to transmit the power generated by the Chinsan No. 1 nuclear generating unit; and (iii) the provision of equipment for system load dispatch. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Taiwan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Nuclear, Power Generation (CCGT), Geothermal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
