POWER III
One of 1,535 projects Taiyo tracks in Zimbabwe.
Source: World Bank Group
The short-term objectives of the project are to: (a) minimize the severity of the power shortage in Zimbabwe caused by the recent drought and facilitate economic recovery by increasing the performance and reliability of the Hwange coal-fired power station, Zimbabwe's largest generating station; (b) reduce the incidence and severity of power blackouts during the power shortage to minimize the econo
- Status
- Closed
- Sector
- Power Transmission, Automotive, Power Generation (CCGT), Government
- Location
- Zimbabwe
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER III
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The short-term objectives of the project are to: (a) minimize the severity of the power shortage in Zimbabwe caused by the recent drought and facilitate economic recovery by increasing the performance and reliability of the Hwange coal-fired power station, Zimbabwe's largest generating station; (b) reduce the incidence and severity of power blackouts during the power shortage to minimize the economic and social disruption they cause. Over the longer term, the project will: (d) selectively increase the capacity and reliability of the distribution system so as to serve more consumers when the power shortage is alleviated; and (e) reduce the unit cost of power and power system investment by commercializing the power utility, improving the condition of existing power facilities, economic power pricing and by short-term technical assistance and training. The project consists of: (a) operation support, maintenance, spares, and major overhaul services and selective equipment upgrades for Hwange Power Station; (b) distribution system reinforcement through the installation of additional transformer capacity, line uprating, and installation of capacitors and load shedding devices; (c) training and technical assistance; (d) provision of workshop equipment and maintenance vehicles; and (e) completion of Zimbabwe Electricity Supply Authority's management information system. |
Original sector | Energy and Extractives,FY17 - Public Administration |
Budget |
Location
Country | Zimbabwe |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Automotive, Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in Zimbabwe
- Batoka Gorge Hydro Electric Power Scheme
- Zimbabwe - Emergency Power Infrastructure Rehabilitation Project - Phase I
- 150-Megawatt Solar Project in Zimbabwe
- Post-Cyclone Idai Emergency Power Restoration Project in Manicaland
- Zimbabwe - Emergency Power Infrastructure Rehabilitation Project
- Matabeleland Solar Power Generation Projects
- Battery Energy Storage System (BESS) Project
- POWER II