logo
ProjectClosed

POWER III

One of 1,535 projects Taiyo tracks in Zimbabwe.

Source: World Bank Group

The short-term objectives of the project are to: (a) minimize the severity of the power shortage in Zimbabwe caused by the recent drought and facilitate economic recovery by increasing the performance and reliability of the Hwange coal-fired power station, Zimbabwe's largest generating station; (b) reduce the incidence and severity of power blackouts during the power shortage to minimize the econo

Status
Closed
Sector
Power Transmission, Automotive, Power Generation (CCGT), Government
Location
Zimbabwe
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about POWER III

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “POWER III” is an infrastructure initiative in the Power Transmission sector, located in Zimbabwe. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The short-term objectives of the project are to: (a) minimize the severity of the power shortage in Zimbabwe caused by the recent drought and facilitate economic recovery by increasing the performance and reliability of the Hwange coal-fired power station, Zimbabwe's largest generating station; (b) reduce the incidence and severity of power blackouts during the power shortage to minimize the economic and social disruption they cause. Over the longer term, the project will: (d) selectively increase the capacity and reliability of the distribution system so as to serve more consumers when the power shortage is alleviated; and (e) reduce the unit cost of power and power system investment by commercializing the power utility, improving the condition of existing power facilities, economic power pricing and by short-term technical assistance and training. The project consists of: (a) operation support, maintenance, spares, and major overhaul services and selective equipment upgrades for Hwange Power Station; (b) distribution system reinforcement through the installation of additional transformer capacity, line uprating, and installation of capacitors and load shedding devices; (c) training and technical assistance; (d) provision of workshop equipment and maintenance vehicles; and (e) completion of Zimbabwe Electricity Supply Authority's management information system.

Original sector

Energy and Extractives,FY17 - Public Administration

Budget

Location

Country

Zimbabwe

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Transmission, Automotive, Power Generation (CCGT), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project