The primary objectives of the Olkaria Geothermal Power Project are to provide a firm source of power and to assist in reducing dependence on imported oil. The project consists of the drilling of geothermal steam wells, the construction of a generating station comprising two 15 MW units, and the installation of 22 km of 132 kV transmission lines. Financing for consulting engineering, training and s

Project Information FAQ

Project Information

5 Q
The project “POWER-III” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Kenya. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The primary objectives of the Olkaria Geothermal Power Project are to provide a firm source of power and to assist in reducing dependence on imported oil. The project consists of the drilling of geothermal steam wells, the construction of a generating station comprising two 15 MW units, and the installation of 22 km of 132 kV transmission lines. Financing for consulting engineering, training and studies of further geothermal potential and the next power project is included. The implementation and financial risks are moderate. The technical risks appear to be normal for such underground work, since seven of the twelve wells already drilled have been producing steam for an extended period. The engineering loan will finance: (i) drilling equipment and supplies to drill production wells for the recovery of steam at Olkaria sufficient to power an electric generator with the capacity of 15 MW, to be followed by further drilling for a second unit of 15 MW; (ii) the cost of consultants for the preparation of specifications for the drilling equipment and for the supervision of the drilling program; (iii) the cost of expatriate drill operators; and (iv) the training of local personnel. The purpose of the drilling will be to provide adequate quantities of steam at appropriate temperatures and pressures for the Power III Project. The training element will help KPC develop indigenous geothermal drilling experience so that they may be capable of executing a continuous drilling program. The risks appear to be normal for such underground work, since five of the seven wells already drilled have been producing steam.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data