logo

POWER-ITUMBIARA

Sector: Water Supply and Storage • Location: Brazil

Source: World Bank Group

Project
Closed

The project is the next step in the development of the hydroelectric potential of the Paranaiba River, one of the major tributaries of the Parana River, draining a basin extending south from Brasilia. It was identified during the CANAMBRA studies in 1965. It is upstream of Sao Simao, where a hydroelectric plant partially financed by the Bank is under construction by CEMIG. The Itumbiara project wa

Project Information FAQ

Project Information

5 Q
The project “POWER-ITUMBIARA” is an infrastructure initiative in the Water Supply and Storage sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project is the next step in the development of the hydroelectric potential of the Paranaiba River, one of the major tributaries of the Parana River, draining a basin extending south from Brasilia. It was identified during the CANAMBRA studies in 1965. It is upstream of Sao Simao, where a hydroelectric plant partially financed by the Bank is under construction by CEMIG. The Itumbiara project was appraised in January 1973, and negotiations were held in May 1973, with Dr. Alipio de Barros and Dr. Mario Bhering representing the Government and the Furnas delegation headed by Dr. John Cotrim. The project consists of a 7km dam, the 2,080 MW Itumbiara hydroelectric power station and related transmission facilities to meet part of the increase in the power demand in the Southeast and adjacent regions of Brazil.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data