logo
ProjectClosed

POWER IV-A

Sector: Power Generation (CCGT) • Location: Haiti

Source: World Bank Group

The Fourth Power Project will help to further develop the energy sector of Haiti through: (i) the expansion of the existing Carrefour diesel power station at Port-au-Prince with two diesel-electric units. The project will further include: (ii) the implementation of a program to improve the generation capacity of the three existing power plants; (iii) the completion of the rehabilitation of the d

Status
Closed
Sector
Power Generation (CCGT), Geothermal, Government
Location
Haiti
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about POWER IV-A

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “POWER IV-A” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Haiti. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Fourth Power Project will help to further develop the energy sector of Haiti through: (i) the expansion of the existing Carrefour diesel power station at Port-au-Prince with two diesel-electric units. The project will further include: (ii) the implementation of a program to improve the generation capacity of the three existing power plants; (iii) the completion of the rehabilitation of the distribution network at Port-au-Prince; and (iv) the preparation of detailed engineering designs for a hydroelectric project in the Artibonite river basin. Finally, the project involves: (v) the provision of consulting services for the management and operation of EdH, as well as project implementation and operation; (vi) the provision of a training program including fellowships; and (vii) the provision of consulting services for the municipal finance study of the Port-au-Prince metropolitan area.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Haiti

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Geothermal, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project