logo
ProjectClosed

POWER IV

Sector: Power Generation (CCGT) • Location: Philippines

Source: World Bank Group

The proposed project would include construction of a thermal power station on Bataan Peninsula with a capacity of 75MW; and the installation of 50MW generating capacity to supplement facilities at the Maria Cristina hydro-station in Northern Mindanao, including control works on Lake Lanao.

Status
Closed
Sector
Power Generation (CCGT), Geothermal, Government, Hydro
Location
Philippines
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about POWER IV

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “POWER IV” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Philippines. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project would include construction of a thermal power station on Bataan Peninsula with a capacity of 75MW; and the installation of 50MW generating capacity to supplement facilities at the Maria Cristina hydro-station in Northern Mindanao, including control works on Lake Lanao.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Philippines

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Geothermal, Government, Hydro

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project