logo
ProjectClosed

POWER IV

One of 3,621 projects Taiyo tracks in Tanzania.

Source: World Bank Group

In order to meet the increase in local demand for electricity through 1990, Tanzania is undertaking this Fourth Power Project. The venture will develop renewable energy resources, new job opportunities as well as supplying power to isolated areas. In addition, it will replace production from diesel sets, thus providing substantial foreign exchange savings as well as laying the basis for improved p

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Hydro, Tunnel, Government
Location
Tanzania
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about POWER IV

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “POWER IV” is an infrastructure initiative in the Water Supply and Storage sector, located in Tanzania. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In order to meet the increase in local demand for electricity through 1990, Tanzania is undertaking this Fourth Power Project. The venture will develop renewable energy resources, new job opportunities as well as supplying power to isolated areas. In addition, it will replace production from diesel sets, thus providing substantial foreign exchange savings as well as laying the basis for improved power sector coordination, tariff policy, power system control and load dispatching practices. A further objective of the project is to maintain and further improve Tanesco's operations through support of its training and management programs. Specifically, the project components include: (a) construction of a water intake; a headrace tunnel as well as a vertical penstock system leading to an underground powerhouse; a tailrace tunnel; a switchyard; and ancillary buildings. The project will also include: (b) construction of a system control center at Dar es Salaam; (c) rehabilitation of the existing Ubongo diesel station and other power system facilities. Funds are also intended for: (d) training and management programmes; and finally for (e) consultancy services.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Tanzania

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Hydro, Tunnel, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project