POWER IV
Sector: Water Supply and Storage • Location: Tanzania
Source: World Bank Group
In order to meet the increase in local demand for electricity through 1990, Tanzania is undertaking this Fourth Power Project. The venture will develop renewable energy resources, new job opportunities as well as supplying power to isolated areas. In addition, it will replace production from diesel sets, thus providing substantial foreign exchange savings as well as laying the basis for improved p
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In order to meet the increase in local demand for electricity through 1990, Tanzania is undertaking this Fourth Power Project. The venture will develop renewable energy resources, new job opportunities as well as supplying power to isolated areas. In addition, it will replace production from diesel sets, thus providing substantial foreign exchange savings as well as laying the basis for improved power sector coordination, tariff policy, power system control and load dispatching practices. A further objective of the project is to maintain and further improve Tanesco's operations through support of its training and management programs. Specifically, the project components include: (a) construction of a water intake; a headrace tunnel as well as a vertical penstock system leading to an underground powerhouse; a tailrace tunnel; a switchyard; and ancillary buildings. The project will also include: (b) construction of a system control center at Dar es Salaam; (c) rehabilitation of the existing Ubongo diesel station and other power system facilities. Funds are also intended for: (d) training and management programmes; and finally for (e) consultancy services. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in Tanzania
- Open for FDI through a minority stake/Development of a new project/Processing and preserving of fish and fish products/BLUE PROCESSING COMPANY .LTD
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of plastics products/Jafnob Printing and Packaging Ltd
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of soap and detergents, cleaning and polishing preparations, perfumes and toilet preparations/NCG CHEMICAL INDUSTRIES
- DAR ES SALAAM WATER SUPPLY&SANITATION
- Silverlands Tanzania Limited
- Kahama Mining Corp. Ltd.
- Tabora Water Supply Scheme, Tanzania
