POWER IV
One of 3,621 projects Taiyo tracks in Tanzania.
Source: World Bank Group
In order to meet the increase in local demand for electricity through 1990, Tanzania is undertaking this Fourth Power Project. The venture will develop renewable energy resources, new job opportunities as well as supplying power to isolated areas. In addition, it will replace production from diesel sets, thus providing substantial foreign exchange savings as well as laying the basis for improved p
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Hydro, Tunnel, Government
- Location
- Tanzania
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER IV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In order to meet the increase in local demand for electricity through 1990, Tanzania is undertaking this Fourth Power Project. The venture will develop renewable energy resources, new job opportunities as well as supplying power to isolated areas. In addition, it will replace production from diesel sets, thus providing substantial foreign exchange savings as well as laying the basis for improved power sector coordination, tariff policy, power system control and load dispatching practices. A further objective of the project is to maintain and further improve Tanesco's operations through support of its training and management programs. Specifically, the project components include: (a) construction of a water intake; a headrace tunnel as well as a vertical penstock system leading to an underground powerhouse; a tailrace tunnel; a switchyard; and ancillary buildings. The project will also include: (b) construction of a system control center at Dar es Salaam; (c) rehabilitation of the existing Ubongo diesel station and other power system facilities. Funds are also intended for: (d) training and management programmes; and finally for (e) consultancy services. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Tanzania |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Hydro, Tunnel, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Tanzania
- Open for FDI through a minority stake/Development of a new project/Processing and preserving of fish and fish products/BLUE PROCESSING COMPANY .LTD
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of plastics products/Jafnob Printing and Packaging Ltd
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of soap and detergents, cleaning and polishing preparations, perfumes and toilet preparations/NCG CHEMICAL INDUSTRIES
- Dar es Salaam Water Distribution
- Kahama Mining Corp. Ltd.
- Tabora Water Supply Scheme, Tanzania
- Lower Kihansi Hydropower Dam and Reservoir Project
- Open for FDI through a majority stake/Establishment of storage or distribution/sales outlet/Manufacture of tanks, reservoirs and containers of metal/EDCOM LIMITED
