logo

POWER IV

Sector: Water Supply and Storage • Location: Tanzania

Source: World Bank Group

Project
Closed

In order to meet the increase in local demand for electricity through 1990, Tanzania is undertaking this Fourth Power Project. The venture will develop renewable energy resources, new job opportunities as well as supplying power to isolated areas. In addition, it will replace production from diesel sets, thus providing substantial foreign exchange savings as well as laying the basis for improved p

Project Information FAQ

Project Information

5 Q
The project “POWER IV” is an infrastructure initiative in the Water Supply and Storage sector, located in Tanzania. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In order to meet the increase in local demand for electricity through 1990, Tanzania is undertaking this Fourth Power Project. The venture will develop renewable energy resources, new job opportunities as well as supplying power to isolated areas. In addition, it will replace production from diesel sets, thus providing substantial foreign exchange savings as well as laying the basis for improved power sector coordination, tariff policy, power system control and load dispatching practices. A further objective of the project is to maintain and further improve Tanesco's operations through support of its training and management programs. Specifically, the project components include: (a) construction of a water intake; a headrace tunnel as well as a vertical penstock system leading to an underground powerhouse; a tailrace tunnel; a switchyard; and ancillary buildings. The project will also include: (b) construction of a system control center at Dar es Salaam; (c) rehabilitation of the existing Ubongo diesel station and other power system facilities. Funds are also intended for: (d) training and management programmes; and finally for (e) consultancy services.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data