POWER IV
Sector: Power Generation (CCGT) • Location: Jordan
Source: World Bank Group
The primary objective of the Fourth Power Project is to provide adequate transmission and distribution network facilities to meet the rapidly growing power needs and to improve the quality of power supply services in Jordan in the most economical way. The project will comprise: (a) construction of about 160 km of 132-kV transmission lines; (b) construction of five new transformer and extension of
- Status
- Closed
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Hydro, Government
- Location
- Jordan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER IV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The primary objective of the Fourth Power Project is to provide adequate transmission and distribution network facilities to meet the rapidly growing power needs and to improve the quality of power supply services in Jordan in the most economical way. The project will comprise: (a) construction of about 160 km of 132-kV transmission lines; (b) construction of five new transformer and extension of five existing transformer substations, with a total capacity of about 619 MVA; (c) extension of the urban distribution network, including power supply to three low-cost housing developments; (d) electrification of about 20 villages around Amman and 30 villages in the Central and Southern Regions of Jordan; (e) consultant services for project engineering and construction; (f) review of JEPCO's organization and management; (g) training program for JEA's and JEPCO's staff; and (h) consultant services to assist in energy sector development. The project will serve municipal and industrial load centers from the national grid, reinforcing substation capacity at five important load centers and help electrify about 50 villages with a total of 23,000 inhabitants and three low-cost housing areas being developed for 28,000 inhabitants. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Jordan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details