POWER IV
Sector: Power Generation (CCGT) • Location: Cyprus
Source: World Bank Group
The project proposed for Bank financing is part of EAC's development program for 1972-76 and consists of: (a) expansion of the Moni generating station with the installation of a sixth 30 MW steam turbo-generator similar to the existing units financed with previous Bank loans; and (b) about 45 percent of the Authority's transmission system and about one-fourth of its distribution investment through
- Status
- Closed
- Sector
- Power Generation (CCGT), Geothermal, Government
- Location
- Cyprus
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER IV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project proposed for Bank financing is part of EAC's development program for 1972-76 and consists of: (a) expansion of the Moni generating station with the installation of a sixth 30 MW steam turbo-generator similar to the existing units financed with previous Bank loans; and (b) about 45 percent of the Authority's transmission system and about one-fourth of its distribution investment through 1976. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Cyprus |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Geothermal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
