logo

POWER IV

Sector: Power Generation (CCGT) • Location: Liberia

Source: World Bank Group

Project
Closed

The proposed project aims to assist the Liberia Electricity Corporation (LEC) in: (a) expanding its generating capacity; (b) strengthening its management, staffing, and financial position; and (c) increasing access to electric power for low-income urban households. The project would consist of: expansion of generating facilities by about 26 MW; power distribution to urban poor; vehicles and equipm

Project Information FAQ

Project Information

5 Q
The project “POWER IV” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Liberia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project aims to assist the Liberia Electricity Corporation (LEC) in: (a) expanding its generating capacity; (b) strengthening its management, staffing, and financial position; and (c) increasing access to electric power for low-income urban households. The project would consist of: expansion of generating facilities by about 26 MW; power distribution to urban poor; vehicles and equipment; rural transmission and frequency conversion studies; and technical assistance for management and training. Benefits would comprise: (a) satisfaction of power demand in the LEC system until 1985 and its positive impact on economic, industrial and commercial activities; (b) improvement of LEC's management, staffing and finances; and (c) supply of electric power to about 5,000 low-income families in the Monrovia area. The risks involved in the physical implementation of the project are not greater than normal for projects of this type. However, there may be risks with respect to the implementation of the non-physical aspects of the project (e.g., management, training and financial viability of LEC), although measures have been included in the Loan and Guarantee Agreements to minimize them.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data