logo
ProjectClosed

POWER IV

Sector: Power Generation (CCGT) • Location: Liberia

Source: World Bank Group

The proposed project aims to assist the Liberia Electricity Corporation (LEC) in: (a) expanding its generating capacity; (b) strengthening its management, staffing, and financial position; and (c) increasing access to electric power for low-income urban households. The project would consist of: expansion of generating facilities by about 26 MW; power distribution to urban poor; vehicles and equipm

Status
Closed
Sector
Power Generation (CCGT), Automotive, Geothermal, Manufacturing (Industrial), Government, Commercial
Location
Liberia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about POWER IV

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “POWER IV” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Liberia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project aims to assist the Liberia Electricity Corporation (LEC) in: (a) expanding its generating capacity; (b) strengthening its management, staffing, and financial position; and (c) increasing access to electric power for low-income urban households. The project would consist of: expansion of generating facilities by about 26 MW; power distribution to urban poor; vehicles and equipment; rural transmission and frequency conversion studies; and technical assistance for management and training. Benefits would comprise: (a) satisfaction of power demand in the LEC system until 1985 and its positive impact on economic, industrial and commercial activities; (b) improvement of LEC's management, staffing and finances; and (c) supply of electric power to about 5,000 low-income families in the Monrovia area. The risks involved in the physical implementation of the project are not greater than normal for projects of this type. However, there may be risks with respect to the implementation of the non-physical aspects of the project (e.g., management, training and financial viability of LEC), although measures have been included in the Loan and Guarantee Agreements to minimize them.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Liberia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Automotive, Geothermal, Manufacturing (Industrial), Government, Commercial

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project