POWER IX
Sector: Power Generation (CCGT) • Location: Indonesia
Source: World Bank Group
The Ninth Power will expand PLN's urgently needed base load generating capacity in Java. It will provide for: (a) the installation of the second 400 MW generating set (Unit No. 2) at Suralaya with coal handling and ash disposal facilities for Unit No. 1 and Unit No. 2; (b) the construction of the 500 kV transmission lines from Suralaya to Semarang with 500 kV substations at Suralaya, Jakarta, Band
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Ninth Power will expand PLN's urgently needed base load generating capacity in Java. It will provide for: (a) the installation of the second 400 MW generating set (Unit No. 2) at Suralaya with coal handling and ash disposal facilities for Unit No. 1 and Unit No. 2; (b) the construction of the 500 kV transmission lines from Suralaya to Semarang with 500 kV substations at Suralaya, Jakarta, Bandung and Semarang; (c) the provision of a simulator at Suralaya for the training of the operating staff; (d) the establishment of a Java system control center at Jakarta; and (e) the consulting services including training. No engineering risk is foreseen in the type of work involved in the project. Delays in land acquisition may occur. However, appropriate measures have been included in the project to prevent them. There is a possibility that coal may not be available from the Bukit Asam by the expected commission date of the Suralaya station, in which case it will be necessary to use fuel oil in the plant and the project has been designed to permit it. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
