logo

POWER IX

Sector: Power Generation (CCGT) • Location: Indonesia

Source: World Bank Group

Project
Closed

The Ninth Power will expand PLN's urgently needed base load generating capacity in Java. It will provide for: (a) the installation of the second 400 MW generating set (Unit No. 2) at Suralaya with coal handling and ash disposal facilities for Unit No. 1 and Unit No. 2; (b) the construction of the 500 kV transmission lines from Suralaya to Semarang with 500 kV substations at Suralaya, Jakarta, Band

Project Information FAQ

Project Information

5 Q
The project “POWER IX” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Ninth Power will expand PLN's urgently needed base load generating capacity in Java. It will provide for: (a) the installation of the second 400 MW generating set (Unit No. 2) at Suralaya with coal handling and ash disposal facilities for Unit No. 1 and Unit No. 2; (b) the construction of the 500 kV transmission lines from Suralaya to Semarang with 500 kV substations at Suralaya, Jakarta, Bandung and Semarang; (c) the provision of a simulator at Suralaya for the training of the operating staff; (d) the establishment of a Java system control center at Jakarta; and (e) the consulting services including training. No engineering risk is foreseen in the type of work involved in the project. Delays in land acquisition may occur. However, appropriate measures have been included in the project to prevent them. There is a possibility that coal may not be available from the Bukit Asam by the expected commission date of the Suralaya station, in which case it will be necessary to use fuel oil in the plant and the project has been designed to permit it.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data