logo

POWER IX

Sector: Power Generation (CCGT) • Location: Indonesia

Source: World Bank Group

Project
Closed

The Ninth Power will expand PLN's urgently needed base load generating capacity in Java. It will provide for: (a) the installation of the second 400 MW generating set (Unit No. 2) at Suralaya with coal handling and ash disposal facilities for Unit No. 1 and Unit No. 2; (b) the construction of the 500 kV transmission lines from Suralaya to Semarang with 500 kV substations at Suralaya, Jakarta, Band

Status
Closed
Sector
Power Generation (CCGT), Oil and Gas, Geothermal, Advanced Electronics, Government
Location
Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about POWER IX

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “POWER IX” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Ninth Power will expand PLN's urgently needed base load generating capacity in Java. It will provide for: (a) the installation of the second 400 MW generating set (Unit No. 2) at Suralaya with coal handling and ash disposal facilities for Unit No. 1 and Unit No. 2; (b) the construction of the 500 kV transmission lines from Suralaya to Semarang with 500 kV substations at Suralaya, Jakarta, Bandung and Semarang; (c) the provision of a simulator at Suralaya for the training of the operating staff; (d) the establishment of a Java system control center at Jakarta; and (e) the consulting services including training. No engineering risk is foreseen in the type of work involved in the project. Delays in land acquisition may occur. However, appropriate measures have been included in the project to prevent them. There is a possibility that coal may not be available from the Bukit Asam by the expected commission date of the Suralaya station, in which case it will be necessary to use fuel oil in the plant and the project has been designed to permit it.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Indonesia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Oil and Gas, Geothermal, Advanced Electronics, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project