logo
ProjectClosed

POWER IX

Closed · Malaysia

Source: World Bank Group

The proposed project consists of (a) construction of two dams and hydroelectric power stations in the upper reaches of the Perak River: Bersia (72 MW) and Kenering (120 MW), (b) supply and installation of associated transmission and substation facilities, and (c) energy sector development study. The primary objective of the project is to utilize fully the flow of the Perak River regulated by the r

Status
Closed
Sector
Power Generation (CCGT), Commercial, Hydro, Government
Location
Malaysia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about POWER IX

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “POWER IX” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Malaysia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project consists of (a) construction of two dams and hydroelectric power stations in the upper reaches of the Perak River: Bersia (72 MW) and Kenering (120 MW), (b) supply and installation of associated transmission and substation facilities, and (c) energy sector development study. The primary objective of the project is to utilize fully the flow of the Perak River regulated by the recently completed Temengor Project (348 MW) 20 km upsteam of the Bersia site. The associated transmission/substation facilities will provide the basis for accelerated rural electrification to be implemented in the near future. Co-financing is arranged with CDC (UK), CIDA (Canada), OECF (Japan) and commercial banks. There are no significant risks or technical difficulties associated with the project.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Malaysia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Hydro, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project