logo
ProjectClosed

POWER LOSS REDUCTION

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The objectives of the Power Loss Reduction Project are: 1) to reduce non-technical electricity losses (mainly due to theft of electricity) thereby reducing uneconomic use of electricity and increasing electricity revenue; and 2) to support institutional reform and strengthening in the power subsector. The project will consist of the following components: an action plan to reduce non-technical powe

Status
Closed
Sector
Power Generation (CCGT), Government
Location
Albania
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about POWER LOSS REDUCTION

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “POWER LOSS REDUCTION” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Albania. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objectives of the Power Loss Reduction Project are: 1) to reduce non-technical electricity losses (mainly due to theft of electricity) thereby reducing uneconomic use of electricity and increasing electricity revenue; and 2) to support institutional reform and strengthening in the power subsector. The project will consist of the following components: an action plan to reduce non-technical power losses, technical assistance and training for the power loss reduction program, and support for institutional reform and strengthening. The action plan includes: transferring the electricity inspectors to the Albanian Electroenergetic Corporation (KESH), increasing their numbers, reorganizing them, improving their equipment and assuring police support if needed; replacing broken or faulty meters in the cities of Tirana, Durres, Elabasan, Shkoder and Vlore, and upgrading meter testing, calibration and repair; improving consumer services management through establishing consumer contracts, creating a better database, carrying out a publicity campaign, and introducing incentive schemes in the distribution entities. KESH will be converted to a joint stock company and establish new accounting and financial systems.

Original sector

Energy and Extractives

Budget

Location

Country

Albania

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project