Power of Siberia 1 Pipeline Expansion
Planned · China · Last reported Aug 2025
Source: Baird Maritime
The existing Power of Siberia 1 pipeline, which began deliveries in 2019 from East Siberia to China, is planned to have its gas supply increased by six billion cubic metres per year starting from 2031. China is considering increasing its purchases via this pipeline as the Power of Siberia 2 project stalls. PipeChina has launched a study to expand its domestic network to accommodate the increased g
- Status
- Prospective
- Sector
- Oil and Gas, Seaport, Power Generation (CCGT)
- Location
- China
- Updated
- 22 Jul 2026
- Source
- Baird Maritime
ConstructChat
Ask ConstructChat about Power of Siberia 1 Pipeline Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The existing Power of Siberia 1 pipeline, which began deliveries in 2019 from East Siberia to China, is planned to have its gas supply increased by six billion cubic metres per year starting from 2031. China is considering increasing its purchases via this pipeline as the Power of Siberia 2 project stalls. PipeChina has launched a study to expand its domestic network to accommodate the increased gas supply, with construction potentially starting in the second half of 2026. |
Original sector | Energy |
Location
Country | China |
Source
Source | Baird Maritime |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Seaport, Power Generation (CCGT) |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
