logo
ProjectProposed

Power Pass Power

The status, timeline and source of this project. A free account opens every field.

Source: Dezeen

Transforming Lagos' 1923 Ijora Power Station into a cultural powerhouse for Nigeria's creative industries, restoring the industrial shell and inserting flexible spaces for exhibitions, studios, and training, with renewable energy systems reducing environmental impact.

Status
Prospective
Sector
Manufacturing (Industrial), Power Generation (CCGT)
Location
Lagos, Nigeria
Updated
22 Jul 2026
Source
Dezeen

ConstructChat

Ask ConstructChat about Power Pass Power

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Power Pass Power” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Lagos, Nigeria. Taiyo aggregates data on it from Dezeen.

Participants

Not available for this record.

Status

Original status

proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Transforming Lagos' 1923 Ijora Power Station into a cultural powerhouse for Nigeria's creative industries, restoring the industrial shell and inserting flexible spaces for exhibitions, studios, and training, with renewable energy systems reducing environmental impact.

Original sector

Built Environment

Location

Country

Nigeria

City

Lagos

Source

Source

Dezeen

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Power Generation (CCGT)

Article published date

2025-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project