Power Plant Boiler Control Upgrades
Closed · New York · Last reported Oct 2024
Source: Dodge USA
The Project includes Materials, Labors and Equipment for boiler maintenance and installation firms to perform the replacement of the Combustion Control System for three (3) Indek Volcano 70,000 lb./hr. 150 PSI boilers, Plant Master Control, and a Condensate Economizer Control as further described in the RFP.
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Manufacturing (Industrial)
- Location
- Buffalo, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Power Plant Boiler Control Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes Materials, Labors and Equipment for boiler maintenance and installation firms to perform the replacement of the Combustion Control System for three (3) Indek Volcano 70,000 lb./hr. 150 PSI boilers, Plant Master Control, and a Condensate Economizer Control as further described in the RFP. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Buffalo |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Manufacturing (Industrial) |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
