Power Plant Parkway Sidewalks
One of 10,000+ projects Taiyo tracks in Virginia.
Source: Dodge USA
bids for the construction of Power Plant Parkway Sidewalks. The work under this Project generally consists of proposed improvements to the existing roadway corridor including constructing concrete sidewalk and asphalt path behind existing curb, and installing pedestrian signals and crosswalks.
- Status
- Closed
- Sector
- Commercial, Road, Power Generation (CCGT), Cement, Car parking, Automotive
- Location
- Hampton, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Power Plant Parkway Sidewalks
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | bids for the construction of Power Plant Parkway Sidewalks. The work under this Project generally consists of proposed improvements to the existing roadway corridor including constructing concrete sidewalk and asphalt path behind existing curb, and installing pedestrian signals and crosswalks. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Hampton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Road, Power Generation (CCGT), Cement, Car parking, Automotive |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
