logo
ProjectClosed

Power Pole Change Out

Sector: Power Transmission • Location: Sandersville, Georgia, United States of America

Source: Dodge USA

The project shall consist of the following: The Contractor will responsible for removing the existing poles, installing new poles, digging holes for the new installation and placing the new pole as close as possible to the existing pole. These poles would consist of fifteen (15) 45 ft, two (2) 40 ft and one (1) 50 ft Wooden Primary Electrical Distribution poles. Single phase, 2 phase and 3 phase p

Status
Closed
Sector
Power Transmission, Power Generation (CCGT), Government, Commercial
Location
Sandersville, Georgia, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Power Pole Change Out

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Power Pole Change Out” is an infrastructure initiative in the Power Transmission sector, located in Sandersville, Georgia, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project shall consist of the following: The Contractor will responsible for removing the existing poles, installing new poles, digging holes for the new installation and placing the new pole as close as possible to the existing pole. These poles would consist of fifteen (15) 45 ft, two (2) 40 ft and one (1) 50 ft Wooden Primary Electrical Distribution poles. Single phase, 2 phase and 3 phase poles. The Contractor will be responsible for transferring all power lines, transformers, guide wi...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Georgia

City

Sandersville

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT), Government, Commercial

Article published date

2024-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project