Power Pole Replacement
Sector: Power Transmission • Location: Clay Center, Nebraska, United States of America
Source: Dodge USA
The USDA-ARS has a need for the on-site replacement of three transformer power poles and associated hardware. The service covers all labor, parts, and travel expenses. Compliance with state utility regulations regarding operation and maintenance of over 480 Volt power infrastructure is required.
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT), Commercial
- Location
- Clay Center, Nebraska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Power Pole Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The USDA-ARS has a need for the on-site replacement of three transformer power poles and associated hardware. The service covers all labor, parts, and travel expenses. Compliance with state utility regulations regarding operation and maintenance of over 480 Volt power infrastructure is required. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nebraska |
City | Clay Center |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
