Power Sector Generation & Restructuring Project

Sector: Power Generation (CCGT) • Location: Albania

Source: World Bank Group

Project
Closed

The development objective of the project is to achieve significant improvement in power system performance through (i) priority investments to increase domestic thermal generation, and (ii) measures to implement sector reforms and institutional strengthening. The project has the following two components: Component 1) The main component is a combined-cycle power station fueled by distillate oil at

Status
Closed
Sector
Power Generation (CCGT), Oil and Gas, Natural Gas, Geothermal, Commercial, Government
Location
Albania
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Power Sector Generation & Restructuring Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Power Sector Generation & Restructuring Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Albania. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The development objective of the project is to achieve significant improvement in power system performance through (i) priority investments to increase domestic thermal generation, and (ii) measures to implement sector reforms and institutional strengthening. The project has the following two components: Component 1) The main component is a combined-cycle power station fueled by distillate oil at a six-hectare Greenfield site about six km north of Vlore adjacent to an offshore oil tanker terminal. The plant would be designed to allow conversion to natural gas if and when imported gas is brought to Albania. The plant size would be 85 MW - 135 MW depending on the evaluation of bids, which would be requested for this range of plant size. The project cost includes USS 3 million for the needed refurbishment of the existing oil tanker terminal and US$ 4.4 million for a connection to the Albanian transmission system at the planned Babica 220/110 kV substation located seven km away. Component 2) consists of technical assistance to KESH for: bid evaluation, contract administration and supervision of project implementation; formation of a subsidiary company of KESH to own and operate the plant, preparation of a power purchase agreement, and assistance in procuring the services of an operator for an initial period; follow-up studies required by the Environmental Management Plan; examination of the option of soliciting bids to supply gas to the plant and, if this option is considered feasible, preparation of the bid documents and assistance in the procurement process; power sector reform; consumer satisfaction surveys; improvements in inventory control; and training in procurement and environmental management.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Albania

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Oil and Gas, Natural Gas, Geothermal, Commercial, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project