logo

Power Sector Recovery Project

Sector: Power Transmission • Location: Guinea

Source: World Bank Group

Project
Closed

The Guinea Power Recovery Project objective is to improve the technical and commercial performance of the national power utility. The proposed project is designed to restore the viability of the Guinean energy sector based on the recommendations of the Power Sector Diagnostic and Recovery Plan adopted by the Government. Though currently performing poorly, the Guinean power system could become fina

Project Information FAQ

Project Information

5 Q
The project “Power Sector Recovery Project” is an infrastructure initiative in the Power Transmission sector, located in Guinea. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Guinea Power Recovery Project objective is to improve the technical and commercial performance of the national power utility. The proposed project is designed to restore the viability of the Guinean energy sector based on the recommendations of the Power Sector Diagnostic and Recovery Plan adopted by the Government. Though currently performing poorly, the Guinean power system could become financially sustainable in the medium term. Such a turnaround is only possible if: (i) sector governance were improved, (ii) electricity losses (technical and commercial) were reduced; (ii) efficient sector maintenance and investment were enforced; and (iii) additional resources were to be mobilized from donors and increasingly from the private sector to accelerate the implementation of rehabilitation and system development investment, and energy conservation measures. The project is structured around three main components: (1) Financing of a Management Services Contract to support EDG performance improvement, (2) Selected investments to support improvement of Conakry distribution network and commercial performance of EDG, (3) Technical assistance to MEH and project implementation support.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data