logo
ProjectClosed

POWER SECTOR REHAB.

Sector: Power Generation (CCGT) • Location: Angola

Source: World Bank Group

The main objectives of Angola's power rehabilitation program are to: (a) lay the institutional foundation for sustainable operations in the sector; and (b) re-establish the integrity of the transmission grid in the Northern and Central electrical systems that was heavily sabotaged and destroyed during the civil war. The project will include the following components: (a) institutional reforms in

Status
Closed
Sector
Power Generation (CCGT), Commercial, Government
Location
Angola
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about POWER SECTOR REHAB.

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “POWER SECTOR REHAB.” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Angola. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The main objectives of Angola's power rehabilitation program are to: (a) lay the institutional foundation for sustainable operations in the sector; and (b) re-establish the integrity of the transmission grid in the Northern and Central electrical systems that was heavily sabotaged and destroyed during the civil war. The project will include the following components: (a) institutional reforms in the power sector; (b) capacity building in the power utilities to improve management and maintenance practices; (c) assistance to the Ministry of Energy to define the legal and institutional framework for the power sector and to coordinate the implementation of the power sector rehabilitation program; (d) rehabilitation of transmission lines and substations in the Quileva-Lomaum-Huambo corridor and of the distribution network of Huambo; (e) a pilot program of prepayment meters; and (f) engineering studies and supervision of the rehabilitation program in the Northern System.

Original sector

Energy and Extractives,FY17 - Public Administration

Budget

Location

Country

Angola

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project