Power Sector Rehabilitation & Expansion
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The main objectives of the Power Sector Rehabilitation and Expansion Project are to: 1) assist the Government in optimizing its investment decisions and help meet demand growth; 2) help improve the efficiency of the power supply system by rehabilitating and reinforcing transmission and distribution systems; converting generating plants from open to combined cycle operations; and installing modern
- Status
- Closed
- Sector
- Power Generation (CCGT), Hydro, Government
- Location
- Vietnam
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Power Sector Rehabilitation & Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objectives of the Power Sector Rehabilitation and Expansion Project are to: 1) assist the Government in optimizing its investment decisions and help meet demand growth; 2) help improve the efficiency of the power supply system by rehabilitating and reinforcing transmission and distribution systems; converting generating plants from open to combined cycle operations; and installing modern load dispatch centers; 3) strengthen the planning adiministrative and management capabilities of the power companies through technical assistance and training; 4) rationalize and strengthen the training systems for the power sector; and 5) assist in the reivew of issues and options in the promotion of electricity energy efficiency and demand side management. The project will finance priority investments in the power systems of Southern and Central Vietnam falling under the jurisdictions of Power Company 2 (PC2) and Power Company 3 (PC3). Components for PC2 include: 1) rehabilitation and reinforcement of the distribution system in Ho Chi Minh City (HCMC); 2) conversion of three 37.5 MW open cycle turbines to a 170 MW combined cycle unit at Ba Ria; 3) establishment of the Southern Region Load Dispatch Center; 4) establishment of the Southern Region Training Center; 5) resettlement and/or compensation of persons affected; and 6) consulting services for detailed engineering, procurement and construction supervision, and an engineering study for the Dai Ninh Hydropower project. Components for PC3 include: 1) rehabilitation and reinforcement of the distribution systems of the cities of Hue and Nhatrang; 2) construction of the 220 kV substations at Krongbuk and Nhatrang, and expansion of the 100 kV substations at Nhatrang, Cau Do and Lien Tri; 3) establishment of the Central Region Load Dispatch Center; 4) establishment of the the Central Region Training Center; 5) resettlement and/or compensation of persons affected; 6) consulting services for detailed engineering, procurement and construction supervision. The project also includes: expansion of the National Load Dispatch Center; procurement of equipment for the National Training Center; and engineering studies for the Son La Hydropower project - for the Ministry of Energy. Also for the Power Sector in general: technical assistance in strategic planning, MIS, human resource development, financial management and materials management; and technical assistance in demand-side management and electricity efficiency improvement. |
Original sector | Energy and Extractives,FY17 - Public Administration |
Budget |
Location
Country | Vietnam |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Viet Nam
- Viet Nam: Dakdrinh 125MW Hydropower Plant
- Viet Nam: Viet Nam Gia Lai Wind Power Project
- Viet Nam: VP Bank COVID-19 Response Facility
- Viet Nam: Dak Lak Wind Power Project
- Viet Nam: Supporting green and blue infrastructure development and capital market in Viet Nam
- Viet Nam: Thuan Bac Solar Project
- Viet Nam: Supporting infrastructure development and climate financing in Viet Nam with second facility with VPBank
- Bac Ai Pumped Storage Power Plant Construction Project
