logo
ProjectClosed

Power Sector Rehabilitation & Restructuring Project

Closed · Albania

Source: World Bank Group

The Power Sector Rehabilitation and Restructuring Project will significantly improve the operational effectiveness of the power sector, by implementing electricity loss reduction measures, introducing electricity price rationalization, and initiating a sector regulatory, and restructuring framework, aimed at establishing the preconditions for competition, and privatization. The project has three c

Status
Closed
Sector
Power Generation (CCGT), Government, Residential
Location
Albania
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Power Sector Rehabilitation & Restructuring Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Power Sector Rehabilitation & Restructuring Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Albania. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Power Sector Rehabilitation and Restructuring Project will significantly improve the operational effectiveness of the power sector, by implementing electricity loss reduction measures, introducing electricity price rationalization, and initiating a sector regulatory, and restructuring framework, aimed at establishing the preconditions for competition, and privatization. The project has three components: 1) rehabilitation, and strengthening of the transmission, and distribution systems in the Durrres, Elbasan, and Kucova regions, to improve frequent unscheduled outages, and high technical losses due to overloading, and outdated equipment. Donor-finance investments, on the basis of technical, economic, and environmental feasibilities carried out by Harza Engineering Company International, will be financed by the United States Trade and Development Agency; 2) provision and installation of secure boxes containing meters, to be installed in single-family dwelling units, and, secure collective boxes will be installed in apartment buildings. Additionally, remaining boxes needed for the meters financed under previous operations, by other donors and by the Albanian Power Company (KESH) will be provided, allowing the company to complete it metering program; and, 3) technical assistance will support power sector reforms, preparation of tender documents, assistance to KESH in environmental aspects, and in reviewing inventory control procedures.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Albania

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government, Residential

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project