Power Sector Technical Assistance Project
Sector: Power Transmission • Location: Dominican Republic
Source: World Bank Group
The Power Sector Technical Assistance (TA) Project for the Dominican Republic aims to: 1) strengthen the Government's regulatory and consumer protection performance, 2) improve policy formulation and implementation, 3) design the transmission grid and the wholesale power market, 4) increase the quantity and quality o f electricity for the poor, and 5) protect the environment. There are five mai
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT), Government, Residential, Commercial
- Location
- Dominican Republic
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Power Sector Technical Assistance Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Power Sector Technical Assistance (TA) Project for the Dominican Republic aims to: 1) strengthen the Government's regulatory and consumer protection performance, 2) improve policy formulation and implementation, 3) design the transmission grid and the wholesale power market, 4) increase the quantity and quality o f electricity for the poor, and 5) protect the environment. There are five main components added to which is a project management component. Component 1 reviews and corrects problems with the regulatory system and the institutional structure, and strengthens the Electricity Superintendency (SIE) and the Consumer Protection Office (PROTECOM). Component 2 (i) promotes a national dialogue to achieve a consensus on required reforms and the participation of the private sector; (ii) strengthens the National Energy Commission (CNE); (iii) funds public consultation processes; and (iv) improves the management of Government interests as shareholder in power sector enterprises through the Fondo Patrimonial (FONPER). Component 3 improves system reliability and increases competition in the wholesale power market by supporting business plan creation, installing training programs, identifying alternatives for private sector participation, establishing a transmission expansion plan, and reviewing the methodology used for setting transmission charges. Component 4 improves rural electrification programs and the Blackout Reduction Program in urban barrios. Component 5 supports the preparation of sectoral environmental documents. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Dominican Republic |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Government, Residential, Commercial |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in Dominican Republic
- Construction of Hydroelectric Central Plant - Las Placetas
- Empresa de Distribucion Norte-Sur
- Puerto Plata Barge-Mounted Power Plant
- Empresa de Distribucion Sur (EdeSur) and Empresa de Distribucion Norte (EdeNorte)
- Empresa Generadora Haina
- Los Origenes Power Plant - Phase 2
- Inveravante Bani Wind Farm
- Consorcio Energetico Punta Cana
