Power System Efficiency and Resilience Project
Sector: Power Generation (CCGT) • Location: Myanmar
Source: World Bank
The objective of the Power System Efficiency and Resilience Project for Myanmar is to increase the output and efficiency of power generation and improve the resilience of the power network in support of the government’s program on universal electricity access. The Project has two components. 1. Upgrading Ywama Power Generation Units component will finance the replacement of old gas and steam turbi
- Status
- Closed
- Sector
- Power Generation (CCGT), Wind, Geothermal, Government
- Location
- Myanmar (Burma)
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about Power System Efficiency and Resilience Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of the Power System Efficiency and Resilience Project for Myanmar is to increase the output and efficiency of power generation and improve the resilience of the power network in support of the government’s program on universal electricity access. The Project has two components. 1. Upgrading Ywama Power Generation Units component will finance the replacement of old gas and steam turbines in the Ywama power plant with a highly efficient, state‐of‐the‐art Combined Cycle Gas Turbine (CCGT). The upgrade will be undertaken as a full turnkey project to help address technical and operational challenges during implementation. In addition, technical assistance will be provided to Electric Power Generation Enterprise (EPGE) for project implementation and contract management. 2. Improving Resilience of the Power Network component will finance investments and measures in existing substations aimed at reducing system constraints and strengthening the resilience and preparedness of the power network against climate change and disasters. Power substations and measures under this component will be prioritized based on their relative contribution to support for the implementation of the National Electrification Program (NEP) and improvements in the quality of supply, focusing on areas where disadvantaged households live. Technical assistance will help strengthen the capacity of Department of Power Transmission and Systems Control (DPTSC) on resilience aspects and support project implementation. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Myanmar (Burma) |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Wind, Geothermal, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
