Power System Improvement Project
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Power System Improvement Project for Macedonia aims to achieve the following: 1) increase the efficiency of hydropower generation; 2) expand the generating capacity of the major hydropower plants through rehabilitation; 3) increase system operating efficiency and enable the electric company to optimize operation of its power generation and transmission facilities through reducing costs; 4) beg
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Hydro, Government
- Location
- Macedonia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Power System Improvement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Power System Improvement Project for Macedonia aims to achieve the following: 1) increase the efficiency of hydropower generation; 2) expand the generating capacity of the major hydropower plants through rehabilitation; 3) increase system operating efficiency and enable the electric company to optimize operation of its power generation and transmission facilities through reducing costs; 4) begin reducing high losses in the electricity distribution system; 5) facilitate the development of independent power producers, with the initial plants being mini-hydropower plants; and 6) help reintegrate Macedonia's power company (ESM) into UCPTE (the Western European Electricity network) by improving its system controls. The project consists of three components: 1) rehabilitating the six largest hydropower plants in Macedonia, which represent 91 percent of the country's hydropower capacity; 2) improving the energy management system including modernizing data acquisition and installing remote controls for the power system, completing the dispatch center, and improving telecommunications; and 3) beginning the rehabilitation of the electricity distribution system. |
Original sector | Energy and Extractives |
Budget |
Location
Country | Macedonia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
