logo

Power System Improvement Project

Sector: Power Generation (CCGT) • Location: North Macedonia

Source: World Bank Group

Project
Closed

The Power System Improvement Project for Macedonia aims to achieve the following: 1) increase the efficiency of hydropower generation; 2) expand the generating capacity of the major hydropower plants through rehabilitation; 3) increase system operating efficiency and enable the electric company to optimize operation of its power generation and transmission facilities through reducing costs; 4) beg

Project Information FAQ

Project Information

5 Q
The project “Power System Improvement Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in North Macedonia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Power System Improvement Project for Macedonia aims to achieve the following: 1) increase the efficiency of hydropower generation; 2) expand the generating capacity of the major hydropower plants through rehabilitation; 3) increase system operating efficiency and enable the electric company to optimize operation of its power generation and transmission facilities through reducing costs; 4) begin reducing high losses in the electricity distribution system; 5) facilitate the development of independent power producers, with the initial plants being mini-hydropower plants; and 6) help reintegrate Macedonia's power company (ESM) into UCPTE (the Western European Electricity network) by improving its system controls. The project consists of three components: 1) rehabilitating the six largest hydropower plants in Macedonia, which represent 91 percent of the country's hydropower capacity; 2) improving the energy management system including modernizing data acquisition and installing remote controls for the power system, completing the dispatch center, and improving telecommunications; and 3) beginning the rehabilitation of the electricity distribution system.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data