Power System Improvement Project
Sector: Power Generation (CCGT) • Location: North Macedonia
Source: World Bank Group
The Power System Improvement Project for Macedonia aims to achieve the following: 1) increase the efficiency of hydropower generation; 2) expand the generating capacity of the major hydropower plants through rehabilitation; 3) increase system operating efficiency and enable the electric company to optimize operation of its power generation and transmission facilities through reducing costs; 4) beg
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Power System Improvement Project for Macedonia aims to achieve the following: 1) increase the efficiency of hydropower generation; 2) expand the generating capacity of the major hydropower plants through rehabilitation; 3) increase system operating efficiency and enable the electric company to optimize operation of its power generation and transmission facilities through reducing costs; 4) begin reducing high losses in the electricity distribution system; 5) facilitate the development of independent power producers, with the initial plants being mini-hydropower plants; and 6) help reintegrate Macedonia's power company (ESM) into UCPTE (the Western European Electricity network) by improving its system controls. The project consists of three components: 1) rehabilitating the six largest hydropower plants in Macedonia, which represent 91 percent of the country's hydropower capacity; 2) improving the energy management system including modernizing data acquisition and installing remote controls for the power system, completing the dispatch center, and improving telecommunications; and 3) beginning the rehabilitation of the electricity distribution system. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
