Power System Reliability and Efficiency Improvement Project
Sector: Power Generation (CCGT) • Location: Bangladesh
Source: World Bank Group
The development objective of the Power System Reliability and Efficiency Improvement Project for Bangladesh is to improve the reliability and efficiency of the power system in Bangladesh through optimization of dispatch operation. The project comprises of three components. The first component, technical assistance consists of two sub-components: (i) primary frequency control trials and training fo
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The development objective of the Power System Reliability and Efficiency Improvement Project for Bangladesh is to improve the reliability and efficiency of the power system in Bangladesh through optimization of dispatch operation. The project comprises of three components. The first component, technical assistance consists of two sub-components: (i) primary frequency control trials and training for Power Grid Company of Bangladesh (PGCB) and National Load Dispatch Centre (NLDC) engineers and operators on modern, state‐of‐the‐art frequency control, and dispatch protocols; and (ii) capacity building and institutional review to: (i) acquaint NLDC staff with modern control theory, practical aspects of regulating frequency in real‐time through governor response as well as secondary control, and (ii) build power system dynamic modeling capability using power system simulation for engineers (PSSE). The second component, operational enhancements consists of three sub-components: (i) integration of generators to the NLDC’s supervisory control and data acquisition (SCADA) and energy management system (EMS) system; (ii) upgrading and modernization of the NLDC SCADA and EMS software; and (iii) optimization software for dispatch. The third component, removal of transmission bottlenecks and improvement of voltage quality consists of two sub-components: (i) the upgrade (by re‐conducting with higher capacity conductors) of selected congested 132 kV and 230 kV lines to address existing bottlenecks and enhance system transfer capability; and (ii) dynamic line rating (DLR)12 to improve utilization of limited transmission capacity on 400 km of six critical transmission lines identified by PGCB. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
