POWER-TELECOM PROJEC
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Power and Telecommunications Projects consist of two parts. 1) The new power project includes the construction of the 70 MW Cachi Hydroelectric Plant, associated transmission facilities and other extensions to Instituto Costarricense de Electricidad's (ICE) existing power system. 2) The telecommunication project includes the installation of automatic exchange equipment for 26,000 telephone lin
- Status
- Closed
- Sector
- Power Generation (CCGT), Telecommunications, Government, Hydro
- Location
- Costa Rica
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER-TELECOM PROJEC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Power and Telecommunications Projects consist of two parts. 1) The new power project includes the construction of the 70 MW Cachi Hydroelectric Plant, associated transmission facilities and other extensions to Instituto Costarricense de Electricidad's (ICE) existing power system. 2) The telecommunication project includes the installation of automatic exchange equipment for 26,000 telephone lines, cable and line networks and radio equipment for interurban connections. The projects are technically sound and required to meet the reasonably estimated increase in power demand and to provide the country with the first stage of a modern and efficient telecommunication system. The Borrower, ICE, is experienced and efficient, and its present financial position is sound. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Costa Rica |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Telecommunications, Government, Hydro |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
