Power Transmission & Distribution Project
One of 2,170 projects Taiyo tracks in Albania.
Source: World Bank Group
The Power Transmission and Distribution Project's objectives include: i) improving the overall standard, reliability and efficiency of electric power supply and enhance the efficiency of electricity interchanges with neighboring countries; ii) reducing unbilled electricity consumption; iii) establishing a regulatory framework for the power sector; iv) beginning the process of privatizing the Alban
- Status
- Closed
- Sector
- Power Generation (CCGT), Government
- Location
- Albania
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Power Transmission & Distribution Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Power Transmission and Distribution Project's objectives include: i) improving the overall standard, reliability and efficiency of electric power supply and enhance the efficiency of electricity interchanges with neighboring countries; ii) reducing unbilled electricity consumption; iii) establishing a regulatory framework for the power sector; iv) beginning the process of privatizing the Albanian Electroenergetic Corporation (KESH) in an efficient and non-disruptive way; v) ensuring the financial viability and institutional strength of KESH and the Power Corporations of Elbasan, Shkoder and Vlore; and vi) encouraging energy conservation and efficiency in electric appliances and buildings. The project components include: a) power sector regulatory reform and actions leading to privatization and institutional strengthening; b) technical assistance for: i) privatization and regulatory training of the Ministry of Mineral and Energy Resources (MME), ii) management of KESH's financial department, and iii) engineering, project implementation management and training; and c) transmission, dispatching system and distribution system investments. |
Original sector | Energy and Extractives,FY17 - Public Administration |
Budget |
Location
Country | Albania |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
