POWER TRANSMISSION II
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project is the second phase of a 380-kV power transmission network. The project comprises the construction of about 1,000 km of single circuit transmission lines, 16 new substations and the extension of 8 existing substations with a total transformer capacity of about 10,000 MVA, 3 switching stations, and 9 dispatch centers (1 federal, 6 republican, and Kosovo). The project includes studies of
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT), Government
- Location
- Macedonia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER TRANSMISSION II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is the second phase of a 380-kV power transmission network. The project comprises the construction of about 1,000 km of single circuit transmission lines, 16 new substations and the extension of 8 existing substations with a total transformer capacity of about 10,000 MVA, 3 switching stations, and 9 dispatch centers (1 federal, 6 republican, and Kosovo). The project includes studies of management, tariffs, and system development. The 380-kV system coupled with adequate dispatch facilities is designed to allow for greater reliability, flexibility, and economy in supplying power throughout the country. The second phase (1977-82) of the 380-kV system is an extension and refinement of the basic power grid established under the first phase or first Power Transmission Project in 1972. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Macedonia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
