logo

Power Transmission Project

Sector: Power Transmission • Location: Azerbaijan

Source: World Bank Group

Project
Closed

The Power Transmission Project for Azerbaijan aims to improve the efficiency of the power transmission operation in Azerbaijan through technical and institutional strengthening of the generation/transmission utility. The project has the following four components: Component 1) includes investments to upgrade the electricity dispatch system in the country, which in turn would support the reliable, s

Status
Closed
Sector
Power Transmission, Power Generation (CCGT), Government
Location
Azerbaijan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Power Transmission Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Power Transmission Project” is an infrastructure initiative in the Power Transmission sector, located in Azerbaijan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Power Transmission Project for Azerbaijan aims to improve the efficiency of the power transmission operation in Azerbaijan through technical and institutional strengthening of the generation/transmission utility. The project has the following four components: Component 1) includes investments to upgrade the electricity dispatch system in the country, which in turn would support the reliable, secure and economic operation of the electricity sector, and facilitate financial settlements in a future wholesale electricity market. Component 2) will cover priority investments in rehabilitation of high voltage transmission lines and selected high-voltage substations. Component 3) will provide technical assistance (TA) to improve the management systems of Azerenerji and prepare the company for a future restructured energy sector. Component 4) will finance Incremental Operating Costs for the Project Implementation Unit (PIU).

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Azerbaijan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project