Power Transmission Project
One of 10,000+ projects Taiyo tracks in Poland.
Source: World Bank Group
The Power Transmission Project's objectives are to: 1) improve the reliability of the existing high voltage grid through rehabilitation and reinforcement; 2) enhance security of power supply in Poland by interconnecting the Polish power grid with that of Western Europe, thus improving Poland's power trade and wheeling capability; 3) improve the network's operational performance and control through
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT), Government
- Location
- Poland
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Power Transmission Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Power Transmission Project's objectives are to: 1) improve the reliability of the existing high voltage grid through rehabilitation and reinforcement; 2) enhance security of power supply in Poland by interconnecting the Polish power grid with that of Western Europe, thus improving Poland's power trade and wheeling capability; 3) improve the network's operational performance and control through transmission and loss reduction and improved dispatching, thereby enhancing energy conservation and efficiency; 4) reduce environmental pollution; and 5) enhance the Polish Power Grid Company's (PPGC) institutional capabilities. The project comprises the following major components: 1) substation modernization program, consisting of the modernization of strategic substations in the Western and Central-Western regions of Poland to meet the design performance levels required for the system reliability and international interconnections and shunt reactive compensation at specific substations to ensure steady voltage control; 2) the 220 kilovolt line modernization program; and 3) technical assistance to PPGC. |
Original sector | Energy and Extractives |
Budget |
Location
Country | Poland |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
