POWER TRANSMISSION
Closed · Ecuador
Source: World Bank Group
The proposed project would consist of: (a) the construction of approximately 338 circuit km of 230 kV and approximately 427 circuit km of 138 kV transmission lines; (b) the construction of terminal substations, installation of corresponding step-down transformers, and expansion of the existing substation at Ibara; (c) training and institutional development programs for INECEL; (d) engineering serv
- Status
- Closed
- Sector
- Power Generation (CCGT), Government
- Location
- Ecuador
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER TRANSMISSION
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project would consist of: (a) the construction of approximately 338 circuit km of 230 kV and approximately 427 circuit km of 138 kV transmission lines; (b) the construction of terminal substations, installation of corresponding step-down transformers, and expansion of the existing substation at Ibara; (c) training and institutional development programs for INECEL; (d) engineering services for the design and supervision of installation of a National Load Dispatch Center; and (e) consultant services for supervision of the civil works. The project faces no special technical risks. It is, however, part of an ambitious power sector program which requires a major funding effort. To minimize the risk of program delays because of funding shortfalls, the Government has agreed under the proposed project to provide sufficient financing for the overall program. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Ecuador |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
