logo
ProjectClosed

POWER V INTERIM THER

One of 3,451 projects Taiyo tracks in Honduras.

Source: World Bank Group

The Fifth Power Project will comprise: 1) installation of four 6 MW diesel generating units burning bunker C oil at La Ceiba; 2) construction of a 150 km single-circuit 230 kv transmission line from Suyapa to Pavana and thence to the Nicaraguan border, and appropriate substation equipment at Suyapa and Pavana; 3) construction of a 47 km 138 kv transmission line from La Ceiba to the Aguan Valley, a

Status
Closed
Sector
Power Generation (CCGT), Oil and Gas, Government
Location
Honduras
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about POWER V INTERIM THER

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “POWER V INTERIM THER” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Honduras. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Fifth Power Project will comprise: 1) installation of four 6 MW diesel generating units burning bunker C oil at La Ceiba; 2) construction of a 150 km single-circuit 230 kv transmission line from Suyapa to Pavana and thence to the Nicaraguan border, and appropriate substation equipment at Suyapa and Pavana; 3) construction of a 47 km 138 kv transmission line from La Ceiba to the Aguan Valley, a substation at Coyoles, a terminal at La Ceiba, and construction of about 90 km of 34.5 kv transmission lines in the Aguan Valley; 4) construction of about 150 km of 34.5 kv subtransmission lines and installation of substations to serve new areas; 5) studies of hydroelectric power projects on the Rio Jicatuyo and conclusion on the feasibility study of El Cajon hydroelectric project; 6) preliminary survey of hydroelectric resources in eastern Honduras, particularly on the Rio Patuca; and 7) a training program for ENEE's staff.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Honduras

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Oil and Gas, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project