logo

POWER V INTERIM THER

Sector: Power Generation (CCGT) • Location: Honduras

Source: World Bank Group

Project
Closed

The Fifth Power Project will comprise: 1) installation of four 6 MW diesel generating units burning bunker C oil at La Ceiba; 2) construction of a 150 km single-circuit 230 kv transmission line from Suyapa to Pavana and thence to the Nicaraguan border, and appropriate substation equipment at Suyapa and Pavana; 3) construction of a 47 km 138 kv transmission line from La Ceiba to the Aguan Valley, a

Project Information FAQ

Project Information

5 Q
The project “POWER V INTERIM THER” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Honduras. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Fifth Power Project will comprise: 1) installation of four 6 MW diesel generating units burning bunker C oil at La Ceiba; 2) construction of a 150 km single-circuit 230 kv transmission line from Suyapa to Pavana and thence to the Nicaraguan border, and appropriate substation equipment at Suyapa and Pavana; 3) construction of a 47 km 138 kv transmission line from La Ceiba to the Aguan Valley, a substation at Coyoles, a terminal at La Ceiba, and construction of about 90 km of 34.5 kv transmission lines in the Aguan Valley; 4) construction of about 150 km of 34.5 kv subtransmission lines and installation of substations to serve new areas; 5) studies of hydroelectric power projects on the Rio Jicatuyo and conclusion on the feasibility study of El Cajon hydroelectric project; 6) preliminary survey of hydroelectric resources in eastern Honduras, particularly on the Rio Patuca; and 7) a training program for ENEE's staff.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data