POWER V (KIAMBERE)
Sector: Water Supply and Storage • Location: Kenya
Source: World Bank Group
The main objective of the Kiambere Hydroelectric Power Project is to assure a firm source of reliable electricity generating capacity to meet the growth in demand which is expected by 1987 to exceed the capabilities of existing generating facilities. The project will develop indigenous renewable energy resources and create new job opportunities, particularly during the construction period, and red
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Oil and Gas, Hydro, Tunnel, Metal, Steel, Cement, Government
- Location
- Kenya
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER V (KIAMBERE)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objective of the Kiambere Hydroelectric Power Project is to assure a firm source of reliable electricity generating capacity to meet the growth in demand which is expected by 1987 to exceed the capabilities of existing generating facilities. The project will develop indigenous renewable energy resources and create new job opportunities, particularly during the construction period, and reduce the country's heavy dependence on imported oil. The main project components are: (i) a rock and earthfill dam (approximately 100 m high with a crest length of about one km), a saddle dam with a concrete-lined spillway, and two diversion tunnels; (ii) an intake, a concrete and steel-lined shaft and a tunnel to connect the reservoir to an underground powerhouse, and a reinforced concrete surge shaft near the downstream end of the tunnel; (iii) an underground powerhouse with two 70 MW vertical turbines, and a short tailrace tunnel; (iv) a 220-kV switchyard; (v) 80 km of 220-kV transmission lines to connect the powerhouse to the existing grid; and (vi) consultants' services for detailed design and construction supervision, project team leader, and a panel of experts to advise on civil works. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Kenya |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Oil and Gas, Hydro, Tunnel, Metal, Steel, Cement, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Kenya
- Kenya Electricity Generating Company Olkaria II Expansion Nairobi
- Construction of Phase II Students’ Hostels at Bukura Agricultural College
- CONSTRUCTION OF EPZA WAREHOUSES
- MANUFACTURE OF TEXTILES IN THE EXPORT PROCESSING ZONES.
- Integrated Agricultural (Aquaponics) and Water project
- Kwale Sugar plantation
- Aggreko Embakasi and Eldoret Power Stations
- Malindi water utility contract
