logo

POWER V (KIAMBERE)

Sector: Water Supply and Storage • Location: Kenya

Source: World Bank Group

Project
Closed

The main objective of the Kiambere Hydroelectric Power Project is to assure a firm source of reliable electricity generating capacity to meet the growth in demand which is expected by 1987 to exceed the capabilities of existing generating facilities. The project will develop indigenous renewable energy resources and create new job opportunities, particularly during the construction period, and red

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Oil and Gas, Hydro, Tunnel, Metal, Steel, Cement, Government
Location
Kenya
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about POWER V (KIAMBERE)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “POWER V (KIAMBERE)” is an infrastructure initiative in the Water Supply and Storage sector, located in Kenya. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The main objective of the Kiambere Hydroelectric Power Project is to assure a firm source of reliable electricity generating capacity to meet the growth in demand which is expected by 1987 to exceed the capabilities of existing generating facilities. The project will develop indigenous renewable energy resources and create new job opportunities, particularly during the construction period, and reduce the country's heavy dependence on imported oil. The main project components are: (i) a rock and earthfill dam (approximately 100 m high with a crest length of about one km), a saddle dam with a concrete-lined spillway, and two diversion tunnels; (ii) an intake, a concrete and steel-lined shaft and a tunnel to connect the reservoir to an underground powerhouse, and a reinforced concrete surge shaft near the downstream end of the tunnel; (iii) an underground powerhouse with two 70 MW vertical turbines, and a short tailrace tunnel; (iv) a 220-kV switchyard; (v) 80 km of 220-kV transmission lines to connect the powerhouse to the existing grid; and (vi) consultants' services for detailed design and construction supervision, project team leader, and a panel of experts to advise on civil works.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Kenya

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Oil and Gas, Hydro, Tunnel, Metal, Steel, Cement, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project