POWER V

Sector: Power Generation (CCGT) • Location: Malaysia

Source: World Bank Group

Project
Closed

The project consists of the third stage at Tuanku Ja'afar (Port Dickson) Thermal Station and transmission lines and associated substations to deliver the power to the load centers. The third stages at Port Dickson comprises three new units (Units 5 to 7) each of 120 MW and will bring the station to its final total capacity of 600 MW. The civil works for all three units would be carried out togethe

Project Information FAQ

Project Information

5 Q
The project “POWER V” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Malaysia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consists of the third stage at Tuanku Ja'afar (Port Dickson) Thermal Station and transmission lines and associated substations to deliver the power to the load centers. The third stages at Port Dickson comprises three new units (Units 5 to 7) each of 120 MW and will bring the station to its final total capacity of 600 MW. The civil works for all three units would be carried out together and two of the three 120 MW units (Units 5 and 6) would be in operation in 1974 to meet the conservatively estimated increase in power demand by that time. The third unit would be installed within two years thereafter to meet growth in power demand as it develops. NEB intends to order all three units at once, retaining the option to cancel the third unit should future demand projections show that it will not be needed as soon as presently planned. A new order would then be placed for a third unit to be installed in time to meet the revised load forecast.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data