POWER V
Sector: Power Generation (CCGT) • Location: Malaysia
Source: World Bank Group
The project consists of the third stage at Tuanku Ja'afar (Port Dickson) Thermal Station and transmission lines and associated substations to deliver the power to the load centers. The third stages at Port Dickson comprises three new units (Units 5 to 7) each of 120 MW and will bring the station to its final total capacity of 600 MW. The civil works for all three units would be carried out togethe
- Status
- Closed
- Sector
- Power Generation (CCGT), Geothermal, Government
- Location
- Malaysia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER V
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the third stage at Tuanku Ja'afar (Port Dickson) Thermal Station and transmission lines and associated substations to deliver the power to the load centers. The third stages at Port Dickson comprises three new units (Units 5 to 7) each of 120 MW and will bring the station to its final total capacity of 600 MW. The civil works for all three units would be carried out together and two of the three 120 MW units (Units 5 and 6) would be in operation in 1974 to meet the conservatively estimated increase in power demand by that time. The third unit would be installed within two years thereafter to meet growth in power demand as it develops. NEB intends to order all three units at once, retaining the option to cancel the third unit should future demand projections show that it will not be needed as soon as presently planned. A new order would then be placed for a third unit to be installed in time to meet the revised load forecast. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Malaysia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Geothermal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project