ProjectClosed

POWER V

Sector: Power Generation (CCGT) • Location: Malaysia

Source: World Bank Group

The project consists of the third stage at Tuanku Ja'afar (Port Dickson) Thermal Station and transmission lines and associated substations to deliver the power to the load centers. The third stages at Port Dickson comprises three new units (Units 5 to 7) each of 120 MW and will bring the station to its final total capacity of 600 MW. The civil works for all three units would be carried out togethe

Status
Closed
Sector
Power Generation (CCGT), Geothermal, Government
Location
Malaysia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about POWER V

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “POWER V” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Malaysia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of the third stage at Tuanku Ja'afar (Port Dickson) Thermal Station and transmission lines and associated substations to deliver the power to the load centers. The third stages at Port Dickson comprises three new units (Units 5 to 7) each of 120 MW and will bring the station to its final total capacity of 600 MW. The civil works for all three units would be carried out together and two of the three 120 MW units (Units 5 and 6) would be in operation in 1974 to meet the conservatively estimated increase in power demand by that time. The third unit would be installed within two years thereafter to meet growth in power demand as it develops. NEB intends to order all three units at once, retaining the option to cancel the third unit should future demand projections show that it will not be needed as soon as presently planned. A new order would then be placed for a third unit to be installed in time to meet the revised load forecast.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Malaysia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Geothermal, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project