POWER V
Sector: Power Generation (CCGT) • Location: Chile
Source: World Bank Group
This project will finance the foreign exchange cost of a 400 MW hydroelectric power plant (El Toro) and related works, transmission and distribution facilities, and of consultants' services. The proposed project constitutes part of ENDESA's overall expansion program for the period 1966-72 designed to provide the additional generating, transmission and distribution capacity required to meet expecte
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project will finance the foreign exchange cost of a 400 MW hydroelectric power plant (El Toro) and related works, transmission and distribution facilities, and of consultants' services. The proposed project constitutes part of ENDESA's overall expansion program for the period 1966-72 designed to provide the additional generating, transmission and distribution capacity required to meet expected system load increases. In addition to the construction of the El Toro hydroelectric scheme, and modifications at the existing Abanico hydroelectric plant, other elements include: the addition of equipment associated with the fifth 70 MW generating unit in the Rapel hydroelectric plant; construction of a trunk double circuit 200 KV transmission system to interconnect Santiago with the El Toro plant and the Bocamina thermal plant near Concepcion; other transmission and distribution system expansion, including substations; procurement of electrical and other equipment and supplies; and provision of consulting services for various aspects of the project and studies related to ENDESA's future expansion of the power system. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
