logo

POWER V

Sector: Power Generation (CCGT) • Location: Chile

Source: World Bank Group

Project
Closed

This project will finance the foreign exchange cost of a 400 MW hydroelectric power plant (El Toro) and related works, transmission and distribution facilities, and of consultants' services. The proposed project constitutes part of ENDESA's overall expansion program for the period 1966-72 designed to provide the additional generating, transmission and distribution capacity required to meet expecte

Project Information FAQ

Project Information

5 Q
The project “POWER V” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Chile. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project will finance the foreign exchange cost of a 400 MW hydroelectric power plant (El Toro) and related works, transmission and distribution facilities, and of consultants' services. The proposed project constitutes part of ENDESA's overall expansion program for the period 1966-72 designed to provide the additional generating, transmission and distribution capacity required to meet expected system load increases. In addition to the construction of the El Toro hydroelectric scheme, and modifications at the existing Abanico hydroelectric plant, other elements include: the addition of equipment associated with the fifth 70 MW generating unit in the Rapel hydroelectric plant; construction of a trunk double circuit 200 KV transmission system to interconnect Santiago with the El Toro plant and the Bocamina thermal plant near Concepcion; other transmission and distribution system expansion, including substations; procurement of electrical and other equipment and supplies; and provision of consulting services for various aspects of the project and studies related to ENDESA's future expansion of the power system.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data