POWER VI-DISTRIBUTION
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Sixth Power Project will consist of: (i) rehabilitation and expansion of the urban distribution network in the Jordanian Electric Power Company's (JEPCO) and the Irbid District Electricity Company's (IDECO) concession areas with the supply, construction and erection of low and medium voltage lines, about 180 MVA of power and distribution transformer capacity, and three phase and single-phase c
- Status
- Closed
- Sector
- Power Generation (CCGT), Geothermal, Government
- Location
- Jordan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about POWER VI-DISTRIBUTION
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Sixth Power Project will consist of: (i) rehabilitation and expansion of the urban distribution network in the Jordanian Electric Power Company's (JEPCO) and the Irbid District Electricity Company's (IDECO) concession areas with the supply, construction and erection of low and medium voltage lines, about 180 MVA of power and distribution transformer capacity, and three phase and single-phase consumer connections; (ii) electrification of about 95 villages, with the supply, construction, and erection of medium and low voltage lines and about 6 MVA of distribution transformer capacity, and single-phase consumer connections; (iii) supply of computer hardware and software, and equipment and tools for operation and maintenance with specialized hot line work equipment and associated training; and (iv) consulting services and equipment to assist JEPCO and IDECO in project engineering and construction supervision, and to assist the Ministry of Energy and Mineral Resources in a diagnostic study of the existing power distribution system. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Jordan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Geothermal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
