logo
ProjectClosed

POWER VI (WUJING)

Closed · China

Source: World Bank Group

Since inadequacies in electric generating capacity are likely to be a constraint on China's medium term growth objectives and potential, the Government has given high priority to electric power. In line with this, the proposed project seeks to (i) address the acute power shortage at a major load center in the East China power grid; (ii) support development of a modern distribution network master

Status
Closed
Sector
Power Generation (CCGT), Geothermal, Government
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about POWER VI (WUJING)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “POWER VI (WUJING)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Since inadequacies in electric generating capacity are likely to be a constraint on China's medium term growth objectives and potential, the Government has given high priority to electric power. In line with this, the proposed project seeks to (i) address the acute power shortage at a major load center in the East China power grid; (ii) support development of a modern distribution network master plan for the city of Shanghai; (iii) promote efficiency in the Shanghai Municipal Electric Power Bureau through a staff training program; and (iv) encourage financial reform. Accordingly, the project entails an extension of the existing coal-fired Wujing thermal power station by adding two generating units of 300 MW each; construction of associated 220 kV transmission lines and substations; provision of on-line computer control and automotic load dispatching system for the Shanghai Municipal Electric Power Bureau's (SMEPB) load dispatching center; a master plan study of the distribution network in Shanghai; and a training program.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Geothermal, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project